Southwest Construction
4 Dell Creek Section Zoom To
Grading, draining, placing crushed base and plant mix pavement, bridge rehabilitation, guardrail, fencing and construction of retaining wall from the Bondurant Fire Hall to the mouth of Hoback Canyon.
Scheduled Completion: 6/30/11

Road Mileposts Delays Surface
US 189, US 191 142.6 - 147.7 20 min. delays with stopped conditions. Paved and Dirt

Contractor Info
  • E. H. Oftedal & Sons, Inc.
  • Miles City, MT
  • (406) 232-5911
WYDOT Contact

Last Update: 5/18/10 3:47 PM
11 Variable Speed Limit Zoom To
Installation of variable speed limit signs and miscellaneous work
Scheduled Completion: 12/31/10

Road Mileposts Delays Surface
I 80, US 30 88.86 - 110.36 No delays. Paved

Contractor Info
  • Modern Electric Co.
  • Casper, WY
  • (307) 266-1711
WYDOT Contact

Last Update: 7/27/10 1:52 PM
22 Snake River Canyon Repair Zoom To
Grading, draining, placing crushed base, and bituminous pavement surfacing, minor structural modification and miscellaneous work beginning at RM 118.32 and ending at RM 141.30 on US 26/89 between Alpine Jct. and Hoback Jct.
Scheduled Completion: 10/31/10

Road Mileposts Delays Surface
US 26, US 89 118.32 - 141.3 20 min. delays with stopped conditions. Paved

Contractor Info
  • Hout Fencing of Wyoming, Inc.
  • Worland, WY
  • (307) 347-9360
WYDOT Contact

Last Update: 6/25/10 6:47 AM
24 Mail Cabin Slide Zoom To
Slide repair, plant mix, pavement spot repairs and miscellaneous work
Scheduled Completion: 8/31/10

Road Mileposts Delays Surface
WY 22 13 - 16.9 20 min. delays. Paved

Contractor Info
  • Evans Construction Co.
  • Jackson, WY
  • (307) 733-3029
WYDOT Contact

Last Update: 6/25/10 7:38 AM
26 Evanston Streets Zoom To
Grading, drainging, placing crushed base and bituminous pavement surfacing, sidewalk, curb and gutter, electrical and miscellaneous work on .32 mile of urban route 051 beginning at reference marker 4.9 in the Town of Evanston.
Scheduled Completion: 8/31/10

Road Mileposts Delays Surface
I 80 Bus., US 189 Bus. 4.29 - 4.61 Reduced speeds up to 10 MPH. Paved

Contractor Info
  • J Wright Development, LLC
  • Riverton, UT
  • (801) 302-2200
WYDOT Contact

Last Update: 4/1/10 11:19 AM
29 Hoback Jct Zoom To
Reconstruction of Hoback Jct with a new bridge, retaining wall, landslide stabilization, roundabout, roadway, pathways, and park and ride.
Scheduled Completion: 10/31/12

Road Mileposts Delays Surface
US 26, US 89, US 189, US 191 140.66 - 141.76 No delays. Paved

WYDOT Contact

Last Update: 6/18/10 8:40 AM
32 Federal Project I802192 Green River-Rock Springs Zoom To
Concrete rehabilitation and miscellaneous work on I-80 beginning at RM 86.41 and ending at RM 101.754 between Green River and Rock Springs, located on Highway I-80, known as Federal Project I802192
Scheduled Completion: 9/30/10

Road Mileposts Delays Surface
I 80, US 30 86.41 - 101.754 10 min. delays. Paved

Contractor Info
  • Interstate Improvement, Inc
  • Fairbault, MN
  • (507) 333-2677
WYDOT Contact

Last Update: 5/6/10 3:16 PM
34 District 3 Guardrail Zoom To
Installing new guardrail and upgrading existing guardrail at various locations.
Scheduled Completion: 8/1/10

Road Mileposts Delays Surface
WY 233 4.43 - 15.9 10 min. delays. Paved

WYDOT Contact

Last Update: 7/13/10 8:03 AM
45 Rock Springs-Rawlins (Wamsutter West) Zoom To
Grading, draining, placing crushed base and bituminous pavement leveling and surfacing, bridge removal and replacement, fencing, electrical conductors, roadway lighting system, remote camera system and miscellaneous work.
Scheduled Completion: 11/30/10

Road Mileposts Delays Surface
I 80, US 30 162 - 174.5 Reduced speeds up to 20 MPH. Paved

Contractor Info
  • Knife River
  • Cheyenne, WY
  • (307) 634-5455
WYDOT Contact

Last Update: 4/22/10 8:52 AM
58 I-80 Evanston - Bigelow Zoom To
milling plant mix, concrete slab replacement, slab lifting and undersealing and miscellaneous work on 28.10 miles on I-80 beginning at RM 0.00 between Evanston and Bigelow Int.
Scheduled Completion: 9/30/10

Road Mileposts Delays Surface
I 80, US 189 0 - 28.1 Reduced speeds up to 30 MPH. Paved

Contractor Info
  • Interstate Improvement, Inc
  • Fairbault, MN
  • (507) 333-2677
WYDOT Contact

Last Update: 5/27/10 8:38 AM
60 Maint. Chip Seal Zoom To
Maintenance Chip Seal on WY 412 & US 89
Scheduled Completion: 7/27/10

Road Mileposts Delays Surface
US 89 87.1 - 94 20 min. delays with stopped conditions. Paved
US 89 54.93 - 64 20 min. delays with stopped conditions. Paved
WY 412 2.81 - 11 20 min. delays with stopped conditions. Paved

WYDOT Contact

Last Update: 7/22/10 3:13 PM
63 Cliff Creek Curve Zoom To
Clearing & grubbing, removal of select trees, placement of crushed base and plant mix pavement overlay.
Scheduled Completion: 6/30/11

Road Mileposts Delays Surface
US 189, US 191 148.9 - 149.1 No delays. Paved

Contractor Info
  • E. H. Oftedal & Sons, Inc.
  • Miles City, MT
  • (406) 232-5911
WYDOT Contact

Last Update: 5/13/10 7:12 AM

Numbers by the projects refer to locations on the maps.